إعلان

غروب الامل

عضو مشارك
إنضم
2010/04/08
المشاركات
393
التفاعل
0
النقاط
16
السلام عليكم ورحمة الله وبركاتة

عندى بحث انجليزى ومحتاجة اترجمة استخدمت ترجمة النت بس مش فاهمة حاجة اتمنى لو حد يقدر يساعدنى بالترجمة للعربى]


training guideline .
evacuation planning process for school.
time:10 minutes
trainer: daps consultant .

introduction : *

different to the other previous series of tsunami modules , namely module 1 and 2, this module 3 is only intended for the teachers and the school management as basic knowledge of evacuation planning process. this module contains an consultant explanation on what to do an who is responsible for each step in the evacuation planning process at school this module consists of 5 planning steps necessarily to be know by the school community .the steps in the evacuation planning process are sequentially related to one another , where the first step will result in an output that will be used as an input for the second step . and the second step will result in an output which will be used in the next step , and so on .

* competency .
to understand an evacuation planning process for tsunami at school and
to make a school evacuation plan .
.

indicator
upon the completion of the training,participants are expected to be able to:
identify inputs needed in the evacuation planning process
identify /obtain access to any supporting documents for evacuation planning issued by the local government
[read]identify important factors in the tsunami evacuation planning[/read]
identify safe environment from the potential tsunami hazard
identify vulnerability groups within the school environment
identify critical infrastructure in the vicinity of the school
identify evacuation routes from the school to the safe areas
determine a field coordinator in the evacuation process
develop an evacuation procedure at the school level
identify supporting tools for evacuation
explain the importance of socialization plan
explain the importance of evacuation drill
develop school evacuation plan

tools and materials
a local tsunami hazard map or,if not available,an example from other areas
module 3, evacuation planning process
lcd projector
markers , flip chart ,push pin and other writing materials

zopp cards

video player , of laptop with infocus
video of indonesia tsunami drills or srilanka


(51)
steps of training
1. when available and possible, the meeting is started with playing a video about tsunami evacuation simulation which shows actions taken by a community to save life from tsunami (use indonesia tsunami drill or srilanka ).
2. the trainer and the participants discuss about what they have just observed from the film , and identify important factors from the tsunami evacuation simulation . the results from the identification exercise will be used as a start to enter into the main activity of learning about evacuation planning process .
3. ask participants , what came up their mind when they hear ،evacuation planning process؛
. collect and write keywords in zopp paper
4. present figure 1 to participant . introduce them to the evacuation planning process using the steps presented . mark the keyword from them wich match with the stages .
5. discuss each step detailed and thoroughly each steps and have participant fill out with their context .
6. consolidate the understanding of the participants by reviewing all of the steps and any important considerations in the tsunami evacuation planning process . it is necessary to inform the participants that the success of the evacuation process will be determined by different factors . the working team at school needs to coordinate with the district implement body ( badan penanggulangan bencana daerah / bpbd ) to ensure the success of the evacuation plan .
7. ask the group to develop working team and working plan to make school evacuation plan .

(52)

reading material
evacuation planning process
information background
conducting an activity of evacuation drill to anticipate potential tsunami hazard has an objective to increase community preparedness in anticipating the hazard which potentially to become disaster . evacuation from tsunami requires proper planning . proper planning will hopefully allow a smooth and effective evacuation . this module will discuss tsunami evacuation planning process . there are 5 steps to prepare in the tsunami evacuation planning process are explained sequentially in this module . steps to be taken on evacuation planning process is presented in sequence throughout the module . for a comprehensive overview , please find below diagram shows steps to be taken on evacuation planning process .
1 getting started determine factor to be considered determine method for evacuation process socialization planning process drill planning process
2 hazard map evacuation map evacuation map evacuation strategy socialization result
3 team and responsible person, hazard zone , sop , working team , objective , result , duration
mandate , safe area , safe area , objective , result , duration , target
time frame , evacuation route , evacuation route , target , method
resources , vulnerable group , vulnerable group handling , method , person in charge
references , critical infratsructure , , person in charge
4 working team , working plan , references ,,evacuation map , evacuation strategy , ,socialization activity , drill activity
1 process 2 input 3 factors to be considered 4 output

figure 1 . steps to be taken on evacuation planning process
they yellow boxes consist of steps to be taken , while the blue boxes are factors to be considered in each of the steps . as it shows from the figure , there are 5 steps to be taken . an in depth description can obtained throughout this module .
there are several inputs needed to prepare a work plan ; who is responsible for the production of an evacuation plan , authority (mandate) given to the school , how long ( time frame ) needed to prepare an evacuation plan , resources , and references required for evacuation planning . the inputs needed will be explained in details the following sections:
(53)

وعليكم السلام ورحمة الله وبركاته وعليكم السلام ورحمة الله وبركاته ections:
(53)
*who is responsible
in the evacuation planning , the responsible person for preparing work plan should be clear . school as institution , is responsible on the safety of their community , and includes students , teachers , and staffs on school level , the headmaster is responsible to develop school evacuation plan . the headmaster can form a team working hand in hand to develop school evacuation plan . the team can consist of teachers , parents , and staffs . each of the team members has its own responsibility . the planning process includes responsibility sharing for each member . school team need to coordinate with the local government to make sure that school plan is in line with the local plan .
* Authority (mandate) .
BpBD held the mandate to make evacuation plan in district level . school needs to have a specific evacuation plan to be used by school community . the school plan needs to refer to local plan . representative from bpbd can be invited to be one of the resource people in the planning process , if necessary . the school also needs to coordinate with other institution related in the local evacuation plan . integration of the school plan with the local plan is mandatory .
* schedule (time frame)
the initial preparation needed is to make a schedule for the work plan . it is very important to ensure the effectiveness of the work plan . the school needs to make a schedule for the work plan which indicates when thw work will be commenced and when they will be completed ? develop a work plan with a realistic time frame . in case of bpbd has activity related to evacuation plan , school can adjust their schedule to make sure that their plan is update .
* resources
an important input to develop a work plan the resources needed in the area . the district and / or the school which will develop a work plan for tsunami evacuation planning process needs to identify the resources available and needed , who will be involved , what qualifications required , the amount of fund needed , and which institutions should be involved to assist the process of developing the work plan and to ensure the implementation of the next steps . the resources consist of man power , fund , documentation , and time
* references
references of supporting documents are needed to develop an evacuation plan . they may be in the from of risk maps , master plan , and legal framework . such documents are needed as basic inputs to develop an evacuation plan .
-evacuation map for tsunami
local tsunami evacuation map is the basis for evacuation planning process . the map shows safe areas , risk areas , evacuation points , and evacuation route . tsunami prone area should have a tsunami evacuation map . nevertheless , not all area already have evacuation map . it is possible that only hazard map or all vulnerability map is available in a particular area . if this is the case , the planning process should not stop . there is a principle called "rule of thumb " can be applied . "rule of thumb " is a common sense used to save lives . on tsunami , the rule of thumb for evacuation is stay away from beach and river , and move to higher land (30 m above sea level or higher ) .
- tsunami early warning system

(54)
tsunami early warning system is defined as provision of information timely and effectively , through identified institutions , to the community so that the individuals in the tsunami risk areas are able to take actions , to avoid or to reduce the risks and to prepare for an effective response . tsunami early warning system is a series which consists of equipment and people who analyse natural signs and process the information to be disseminated to the decision makers . early warning plays an important role to minimise potential loss early warning may appear in the from of natural signs or official warning issued by the government . it is recommended to learn again the natural signs of tsunami and the indonesian tsunami early warning system (ina- tews) in module 2 . make sure that the school has the access to the tsunami early warning system implemented by the government .
- legal basis
on national level , law number 24 year 2007 on disaster management is legal the base on disaster management . there is also the presindential decree number 8 year 2008 on national disaster mangement body and other legal basis . in provincial level , some has issued the provincial law related to disaster management . school needs to have a a copy on this legal basis as a reference .

A. step 1;start planning
what needs to be done by the school?
1. to understand the evacuation plan in the district if it is already available .
2. to collect references or documents as previously mentioned above . school needs to have copies of the above documents . an institution or a body which has the mandate to issue such documents already exists . the institution is called satlak or the regional body for disaster management (bpbd) at the provincial or district levels . at the national level , it is called national body for disaster management (badan nasional penanggulangan bencana / bnpb ) . to obtain the documents , one may contact the local bpbd .
3. to from a work team
besides what has been mentioned above , the school also needs to from a work team . the main tasks of the work team are :
a. to study the documents
b. to develop a work plan or strategy for the evacuation planning process at the school level
to optimize the work team at school , the following is recommended;
a. after the documents needed are obtained , allocate time to study and understand the documents and the explanation inside . make sure to know whether the school is located in the risk area or not if there is anything unclear , contacts of the documents .
b. if the district has not developed or does not have complete data required , it should not prevent the school from developing a planning , but the school can begin an evacuation planning process for the safety of all the school community .in case of emergency and there is no evacuation map , use basic evacuation procedure-move away from the coast and rivers , and find higher ground .
as stated earlier , one of the reference of evacuation planning process is a local evacuation map . what the school needs to do if the district does not have an evacuation map?evacuation map is compulsory and preconditioned for developing

(55)
an evacuation plan . if district does not have an evacuation map , the school should encourage and emphasize the importance for the district to have an evacuation map . on the other hand , the school should develop an evacuation map for the school environment at least to give guidance to a safe area . the plan will need to be endorsed by school management .
a tsunami evacuation map must be endeavored by the district which is located in a tsunami prone area . the map shows a region with locations for evacuation identified by the local government . selection of evacuation locations is based on the estimation of potential tsunami effect in the area . using the map , we can determine safe areas to head for , and estimation of distance and time travel to the safe areas . in the evacuation plan , mark the locations where the school and agreed safe areas are .
b. step 2 : determining factors needed for consideration
the second step in the evacuation planning is to determine important factors in the evacuation planning , which is usually shown in the evacuation map . on the evacuation , it is very important to identify hazard area , safe area , and evacuation route . basic information of the map , such as : location of the sea , river , bridge , and critical infrastructure should also shown . all component of the team needs to work together on identifying these factors . if evacuation map is available , these factors can be seen and reviewed using the map . if not , then school need to have their own .
*hazard zone
hazard zone is the areas identified as being at risk towards tsunami threats . hazard zone must be abandoned when receiving tsunami early warning . in the tsunami hazard map , the high hazard zone is usually marked in red and the medium hazard zone is marked in orange . this hazard zone is at risk to experience significant damages in time of tsunami . hazard zone is usually around the beaches with a certain distance or around the river sides . if your school or your homes is located within the hazard zone , you should have a good evacuation strategy . check whether your school is located in the hazard zone .
* safe area
safe areas are the locations which are referred to as the destinations for evacuation , either it is for horizontal evacuation or vertical evacuation ( evacuation shelter building ) . such safe areas are identified as the areas which are not at risk towards tsunami threat . during the development of evacuation plan , safe zone must be identified clearly . safe areas are not the same in each district . the features of safe areas depend on the conditions of the district : far from the beach or on a certain elevation . in general , an example of safe areas from tsunami is :
- an area with a certain distance from the beach ( depending on the gradient of the beach ) or > 4 km from the beach .
- high ground - if the location of a high ground is too far to reach , consider to use story building with robust structure for temporary evacuation ( temporary shelters )
- reachable . it is very important to identify safe areas that can be reach within 10-20 minutes by foot .
- wide -space area , as it is expected that plenty of people will be heading .
there are 2 type of safe area of evacuation point , namely horizontal evacuation and vertical evacuation .

(56)
- horizontal evacuation
one of the evacuation methods is horizontal evacuation , which is to move people to safer areas horizontally or to a higher ground in order that they are prevented from tsunami inundation . horizontal evacuation is generally carried out by moving away from beaches .
- vertical evacuation
if the location of the school is within the coastal vicinity among dense population and buildings that unable to conduct horizontal evacuation due to limited facility and time , vertical evacuation can be opted as an alternative to save life . speacial buildings to be used for vertical evacuation are evacuation shelter buildings (esb) . if shelters are not avaliable in the area , robust story buildings can be used as an alternative for evacuation . the existence of vertical evacuation places need to be considered when developing evacuation plan .

check whether your school is appointed to be one of the evacuation point . if school is the evacuation point , the plan should also be based on that condition
* evacuation routes
besides knowing safe areas from tsunami , it is important to also know evacuation route leading to safe areas when developing evacuation planning . safe routes are the shortest paths with the lowest risk to reach to the safe areas . study the evacuation map . if your area already has a tsunami evacuation map , it is important to know well where the safe areas are and which routes to be followed to arrive in the safe place take the agreed safe routes for evacuation , and follow the route as far as you can . watch for possible panic behavior of the people or the traffic of the people when the warning is issued . consider the travel time needed to reach the safe place . time travel during normal condition is very different from the time of disaster event . not all of the tsunami prone areas in indonesia have tsunami evacuation maps . socialize the evacuation route from school to safe areas , to school community , especially to teacher appointed to be the coordinator of mass movement during evacuation . keep update on the information about the condition of the evacuation route to anticipate any obstacles that may occur .
* vulnerable groups
vulnerable groups are people who need special attention and assistance during evacuation . these groups must be identified clearly in the evacuation planning . vulnerable groups in school may consist of eldery teacher /staff , disabled student , or pregnant teacher / staff , etc . most of student , under 12 years old , goes into vulnerable group , and therefore also need special treatment during evacuation . the group need to be informed so they can prepare and attach themself on the vulnerable group in case evacuation is conducted . normal evacuation procedure cannot be established for these groups . before disaster event , make sure that the school has data of the number of people belong to these groups . discuss at school about how to assist these vulnerable groups in time of evacuation , or contact satlak or the local bpbd at the district or province to obtain information about how to handle vulnerable groups . the school evacuation plan should consider treatment of vulnerable groups .

* critical infrastructure
other important factor s to be considered are critical infrastructure . critical infrastructure constitutes physical building which are vital for the school and community . in school , critical infrastructure may consist of : laboratory with chemical ingredients , school electricity central , school database filing . anticipation is needed to secure these critical infrastructure . damage on the infrastructure will not only effect

(57)
teaching activity post disaster, but can also affect surrounding enviroment. before disaster stirkes, identify the location of critical infrastucture and take secondary hazard risk for surrounding environment.

C . Step 3: Determining Strategy For Evacuation (Developing An Evacuation plan)

The next step in the evacuation planning process is to determine evacuation strategy.
evacuation
strategy is a structured plan which includes to be taken, what needs to be prepared when receving tsunami early warning (TEW),where the safe area during evacuation,which routes ti follow, and who is assigned to give command to the school community when an evacuation is decided, who will gide the movement of the school community. Using the risk ,hazard and evacuation maps and/or infromation from the district as previously explained in step 1 and step 2, the school can develope an evacuation strategy . As most (but not all ) tsunami was preceded
by earthquake, the evacuation strategy should also include
earthquake evacuation strategy.

the school can develop an evacuation strategy
using the risk, hazard and develop an evacuation strategy?

1. Understanding early warning and decision making
tsunami early warning may occur in 2 type, namely natural warning and early warning from BMG or local government . refer to module 2 to have deeper understanding on tsunami early warning. another important factor after receving early warning is decision making . headmaster
as the responsible person in evacuation planning process, is also the decision maker . before disaster strikes, a decision making flow chart is needed .A back
up is also needed ,in case of headmaster is not in place .

2 . To determine safe locations to head for
based on the risk map ,decide the safe locations to head for during evacuations . in accordance with the location condition of the school community, the direction to the safe areas may be horizontal or vertical . it means that they can do horizontal or vertical evacuation . horizontal evacuation is to save life by going up to higher and strong buildings or constructions ( buildings with two or more stories / floors ) . vertical evacuation is opted if the school is located away from the safe areas or the safe areas cannot be reached within an estimated time . make sure before conducting an actual vertical evacuation that the buildings are strong enough and have the capacity to accommodate an estimated number of people . safe areas should also fulfill main criteria : reachable and wide-space . calculate the time requires reaching the area and how many people can fit in the place .
decide and mark , for example in green , the safe locations in the evacuation map . in the actual locations on the ground , safe areas can be marked with the signs of safe areas for evacuation .
3 . to decide on evacuation routes
one part in the evacuation strategy that needs to be prepared is to decide safe routes for evacuation . decide and mark the safe routes in the evacuation map . for example , mark with green line , follow the safe routes that have been agreed upon or

(58)
recommended for evacuation by the local government . the evacuation routes should be planned and decided in advance . in the field or in the actual location , the evacuation routes usually are equipped with evacuation signs , in order to facilitate the movement of the people to the safe areas . it is recommended to use wide road as it should be able to accommodate hundreds ( or thousands ) people . evacuation route should also take into account location of bridges that may fall apart due to major earthquake . evacuation sign need to be placed in intersection to avoid confusion .
4 . to deal with vulnerable groups
if vulnerable groups are identified at the school , make an action plan to provide assistance to the vulnerable groups before evacuation is carried out . ldentify what facility / vehicles to be used , who will deal with these groups . all of these should be planned and made in written as a document for implementation . this document of the condition at the school .
5 . to develop procedures ( sop )
develop a complete evacuation strategy in written . all evacuation plan details at school should be made in written so that it becomes a procedure ( standard operating procedure -sop ) and it can be revised any time in accordance with the latest situation development . thus , it becomes a life document for saving the life of the school community . procedure of tsunami evacuation constitutes a crucial element and integrated in the tsunami evacuation planning process .
the contents of sop are :

a . division of tasks :

division of roles or tasks is a part of the evacuation strategy during evacuation . determine the tasks for each of the members of the school community for evacuation . long before disaster occurs , the names and the tasks division should be made in complete and clear . make sure that each of the assigned persons understands their tasks .
some of the important tasks are :
* receiving information of tsunami early warning
* giving command for evacuation
* guiding the movement of the school community
* coordination in the safe areas .
b. details of steps to be carried out during evacuation
all of the steps to do should be planned well and carefully before a disaster happens .
* what needs to be done by a person who receives tsunami early warning
* how the evacuation command will be issued
* what needs to be done by a person who guides the movement of the community and what needs to be considered
* what needs to be done in the terms of coordination once the group has arrive in safe area , and what needs to be done on safe area .
d . step 4 : making socialization planning for evacuation plan
after all the strategy or the evacuation plan is documented as a procedure , the procedure is meant to be a living document for the school community . the next step is to conduct socialization of the completed evacuation plan . the socialization activities should be planned in advance . the same as the evacuation plan ,

(59)
socialization needs a strategy . how to plan socialization ?
the following is the steps to plan socialization :
1. to decide on the work team
decide a work team at school to organize the socialization of the evacuation plan . the work team can be formed by involving teachers and the school management . if possible , the members of the school committee are to be involved as the members of the work team for socialization . decide the tasks for each of the members in the team .
2 . to decide on the objectives , the expected results and the time frame for the socialization
after the work team is formed , decide the objectives of the socialization , the expected results , and the time frame for the socialization activities . the objectives of the socialization to be carried out by the local bpbd and the school is basically the same , the difference is only on the target groups for the socialization . in general the objective of the socialization at the school is to improve the preparedness of the school community towards potential tsunami hazard . the results expected from the socialization activities are that :
* the information about the school evacuation plan can commonly be understood by the school community
* all of the evacuation components : safe zone , hazard zone , evacuation routes , evacuation signs , safe areas actions to be taken and who leads the evacuation must be understood by the school community
* as a preparedness measure , the school community is ready to anticipate tsunami
* feed backs to the completed evacuation plan can be obtained so that improvement to the evacuation plan document can be made possible .
decide how long the socialization activity will be implemented , and consider the achievement of the objectives and the availability of the resources .
3 . to decide on the target group for the socialization
decide the target groups for the socialization of the tsunami evacuation plan in accordance with the coverage areas . the target groups of the socialization by the local BPBD are clearly different from the target groups aimed by the school community, including the teachers, the school management, the school guards, parents and the students.it will be better if the socialization also consider involving the school committee and the community within the vicinity of the school. parents need to be convinced not to come to the school in case tsunami happen . school will conduct their evacuation plan and bring all students to save areas .
4 . to decide on the method of socialization
the socialization activities can be carried out by the school in different ways . for example , to provide information directly to the school community on a regular basis by conducting regular discussions for the teachers and the school management about evacuation plan , displaying posters showing how to evacuate from tsunami and distributing brochures or leaflets showing how to evacuate from tsunami socialization at the school can use combined selected methods by considering the affecting , the capability of the school and the availability of the resources .
5 . to decide on the officer for socialization
the appointed person along with the team is responsible to prepare and conduct socialization . the team me consist of teachers,school staff , or school committee ,

(60)

e . step 5 : developing planning for evacuation drill :
socialization alone is not enough for school community to take appropriate actions during evacuation process . socialization activity still needs to be followed up with conducting evacuation drill for the school community ; the drill should correspond to the strategy of the evacuation plan developed . evacuation drill is important to be conducted for the school community in order to avoid confusion about what to do when tsunami occurs .
by conducting tsunami drill it is expected that the school community are trained to automatically take appropriate actions when tsunami strikes . evacuation drill for the school community can be conducted together with the drill for the surrounding community , and in coordination with satlak or the local bpbd at the district or province . the same as the step 4 , this evacuation drill should also be planned in advance , and the strategy is prepared . how to plan an evacuation drill ?
the steps to prepare an evacuation drill are as follows :
1 . to decide on the work team :
decide the work team who will organize the evacuation drill at school . the work team in the school should coordinate with the work team from the local bpbd to plan an evacuation drill the work team can be formed from the teachers and the school management . when possible , the work team includes members of the school committee as the members of the work team for tsunami evacuation drill . decide the tasks for each of the members of the work team in the evacuation drill .
2 . to decide on the objectives , the expected results and the type of the evacuation drill :
decide the objectives of the evacuation drill to be conducted . in general , the objective of the drill at school is to train for an appropriate response by the school community to anticipate tsunami . decide also the results to be achieved in the evacuation drill .
3 . to decide on the target participants of the evacuation drill :
the targets of the evacuation drill at school are all the school guards and the students . it will be better if the evacuation drill also considers to involve the school committee and the community around the school . coordinate with the local bpbd .
4 . to decide on the method for evacuation drill :
coordinate with satlak or the local bpbd. the method for evacuation drill should be carried out on the ground and directly to the safe areas . the drill should be started with an explanation , what will be done if the warning sign is heard , how to get to the safe areas , where is the safe areas to be headed for and so on ; all is in accordance with the completed evacuation plan .
5 . to decide on the officers for evacuation drill :
the work team at school needs to select for the officers who organize the evacuation drill . coordinate with the personnel at the satlak or the local bpbd at the district or the province at the all time . personnel for socialization at school can involve sport teachers , bp ( guidance and counseling ) , the school management and the school committee .

(61)

tsunami evacuation plan will not run well if it is not supported by a good preparation of the government , the community , and the school community in the tsunami risk area . a tsunami evacuation planning process needs to be organized carefully . there are five important steps to be prepared in the evacuation planning process , where the five steps are sequentially correlated and cannot be separated .
it is important to remember that the school should always coordinate and synergies with satlak or the local bpbd during the evacuation planning process and during the planning of evacuation drill , so that parties are in good coordination .
concerning with the responsibility of the evacuation planning , students should not be burdened what so ever and are not responsible for the evacuation planning process . the evacuation planning process at school becomes the responsibility of the school management and the teachers .
no need to wait regardless the availability of local evacuation plan ,school needs a school evacuation plan . next important step to make this whole learning process useful is by developing a working and start develop school evacuation plan . safety of all school community relies on the school evacuation plan .

(62)

learning activities :
evacuation planning process :
media and materials :
- local tsunami hazard map or , if not available locally , an example of the same map from the other region
- module 3 , evacuation planning process
- lcd projector
- markers , flip charts , push pin and other writing materials
- zopp cards
- video of tsunami evacuation simulation
- vcd player / laptop
* preparation :
before starting the training , make sure that all of the maps needed are prepared for the learning / training process .
* the steps of learning :
- initial activity .
the meeting is started by playing a video of tsunami evacuation simulation which shows activities of a community saving their life by going to safe areas .
the trainer and the participants conduct a discussion about what they have just observed , identify any important factors necessary for consideration during the tsunami evacuation simulation process . the results of the identification are noted on the boards , without being commented either right or wrong . then it is informed that the training session will be focused on the evacuation planning process . the trainer inform about the
competency to be achieved and the indicators .
- the main activity .
" by connecting it with the previous video show , the trainer inform about the importance of the evacuation planning process and prompt the participants to suggest the steps to be taken in the evacuation planning process and also the sequence of the steps .
" participants are asked to write what came up in their mind when they hear ، evacuation plan ، . write the keyword in the paper . present figure 1 to the participant and match some keyword appears earlier with words in the figure .
" give participant information on what is evacuation plan and what the importance of the plan .
* step 1 . to start planning :
- together , identify who needs to be part of the team to develop evacuation plan , and develop time frame of the activity and resources needed .
- identify references and who / how to access to the documents .
* step 2 . to decide on the factors for consideration :
- explain what is the meaning of each factors . and afterward , mark hazard areas , safe areas , and evacuation point in the map .
_ identify vulnerable groups and the number of the groups in the school .

(63)

- identify critical infrastructure and its location in the map .

* Step 3. To Decide on a method for evacuation(to develop evacuation plan) :

discuss within the group on how to conduct the evacuation .visualize the plan into the SOP.

Decide which safe area to head for, considering time to reach, and what route needs to be taken.

Discuss how to handle vulnerable group.identify support/help available and how to access.

write the result on a paper.

Step 4.To develop a socialization planning for evacuation plan.

Develop the plan to conduct socialization. Emphasize the need to socialize the plan within the school community.

Form the team to prepare socialization. appoint in charge.

Step 5. To develop a planning for evacuation drill

Discuss how the plan should be tested to know whether it is working or not. lead the discussion on the importance of having drill to test the plan.

Prepare the drill by defining the method and the target.

Develop the team and appoint person in charge (use the same team for socialization is an option).

Write the whole plan and have all participant sign the document as agreement.

Together with the participants, the concludes all the important points resulted from the series of discussions conducted and remind the participants that the responsibility for the development of the lies with the teachers and the school management. students are not burdened at all with the planning process.

Consolidation activity
In order to consolidate the understanding of the participants, at the end of the training conduct a review to all steps and important considerations in the tsunami evacuation planning process. Raise some questions by referring to the indicators to consolidate the understanding of the participants. it is necessary to remind the participants that the school should always coordinate and synergies with satlak or the local BPBD in the evacuation planning process and the evacuation drill planning so that each party are in good coordination.
Right after the learning session ended, trainer helps the participant to form a working team and create a working plan to develop a school evacuation plan.
*REFERENCES :
- Dent-Cleveland, L, Surviving Greats Waves of Destruction: Tsunami Curriculum for grades 7-12, Washington military Dept./Emergency Management Div.
- Hidayati , Deny. 2005. Panduan Merintis siaga Bencana Berbasis Masyarakat, Jakarta, LIPI.

- Hidayati, Deny, et.al.2005.Buku Saku Siaga Bencana,Jakarta, LIPI COREMAP.

Afistianto , m.fikri and Adirianto, M.farel.2005.Tsunami,serial pembelajaran anakls



 
My dear I am offering you a solution to your problem. Don't depend on any one just depend on your self to translate it and offer you an excellent link here in the forum to down load very technical translation technique named MultiTrans: this is the link
http://www.rewity.com/vb/t185710.html#:elk